"The work dealing with concrete and bricks has been completed. We are now left with two major things, placing the 45000 plastic seats and working on the pitch." said Polokwane World Cup director Ndavhe Ramakuela.
"The roof which was ordered from Japan and assembled in Johannesburg is the final stages."
Peter Mokaba Sports on track
The Sowetan
June 18, 2009